Prinsco HydroStor HS180 Chambers Fuel Efficient Stormwater Storage for New Gas Station and Retail Center

Quick Details

Product Type(s):
Stormwater chamber

Application Type(s):
Underground Retention/Detention

Installation Date:
October 2020

Location:
Ontario, California United States

Abstract

This project demonstrates the efficient use of Prinsco’s HydroStor HS180 chamber system for a new gas station and retail center. Installed in October 2020, the system effectively manages stormwater runoff while maximizing valuable land space.

Key Project Features:

  • High-Capacity Storage: 35 HS180 chambers provide over 7,600 cubic feet of underground storage, eliminating the need for large retention ponds.
  • Water Quality Protection: The system features a liner, underdrain, and Sediment Rows to prevent contamination and capture over 80% of silt and sediment.
  • Easy Maintenance: Integrated Sediment Rows allow for simple and cost-effective sediment removal.
  • Complete Solution: The project utilizes HS180 chambers, Harco inlet basins, and manifolds for a fully integrated stormwater approach.
  • Durable Construction: HS180 chambers meet stringent industry standards, including AASHTO and ASTM requirements, ensuring long-term performance.

This project highlights the versatility of Prinsco’s HydroStor chambers in meeting the needs of commercial developments.  We partnered closely with the project team to ensure success, because we believe in building strong relationships and exceeding expectations.

Download Project Profile